VBS
Hello everyone back in
Around 7 we went to the Arabic part of town, we walked a lot of blocks! It’s been cool to see the different areas around the city of
Construction
Good progress was made today on both construction projects.
The guys upstairs got the edges of the removed wall fixed up with sheetrock patches and the first coating of drywall compound applied. This puts things in good shape for that to be painted or at least ready to paint by the time we leave. Also, they started and made major progress on the ‘snack shop’ that we are building in the newly-enlarged youth room. The structure is done and it is almost ready for the door and serving window details. Greg has really kept that project moving ahead.

On the flooring project, we have made it across the room in the shortest dimension, where the flooring meets a [curved – tricky edge] stage on the side opposite the entrance. Mike did a great job jumping in whenever we ran into a sticky situation. It is starting to look like something now. We are also sitting in a good position to have this job finished by the time we have to leave.
We swapped Strombergs today, and I switched from the upstairs to the downstairs, otherwise the crew was the same. We also great help from Josh, a young man from the church.
Ron

We are praying for your physical strength and health, your spiritual alertness and power, and your teamwork overall. Keep leaning on the Lord! "And let us not grow weary of doing good, for in due season we will reap, if we do not give up. So then, as we have opportunity, let us do good to everyone, and especially to those who are of the household of faith" (Gal. 6:9-10). Thanks for your ministry!
ReplyDeleteDave and Kathy Linde
Wow, I got tired just watching the VBS video. Good work guys!
ReplyDelete